Field verification & laser scan
We measure the real building before a sheet is cut, so scribes and fillers are drawn, not improvised on site.

01 — Restaurants, offices, medical and retail
Reception desks, bars, paneling and casework built to AWI standards and installed around your open date.
The problem
Commercial millwork fails on schedule far more often than it fails on craft. A shop takes the award, goes quiet for six weeks, then shows up with casework that fights the field conditions — and your opening date moves.
Our solution
We run commercial work like a construction package, not a furniture order: field verification first, shop drawings inside a week, one approval round, then fabrication with an install date already on the calendar.
We measure the real building before a sheet is cut, so scribes and fillers are drawn, not improvised on site.
Full elevations, sections and finish samples in one package your architect can approve in a single round.
Specify the grade and we build to it — including sequenced veneer and documented hardware schedules.
We ship by zone on the day you need it and work nights when the space has to stay open.
The proof
9 wks
Typical drawing-to-punch
1 round
Average submittal approvals
180+ LF
Largest single package