Drawings in 5–7 days
Dimensioned elevations, sections and details in PDF and DWG, formatted for your submittal log.

02 — The millwork package for your project team
Shop drawings in days, RFIs answered the same week, and a punch list that closes clean.
The problem
When the millwork sub is slow, everything downstream is slow. Late submittals push finishes, unanswered RFIs stall inspections, and a shop that can't read a detail turns your design intent into a change order.
Our solution
You get one project contact, drawings that hold your details, and a fabricator that flags conflicts during coordination instead of at install.
Dimensioned elevations, sections and details in PDF and DWG, formatted for your submittal log.
We review MEP and structure against our scope and raise the clash while it's still cheap to fix.
Sample doors, veneer layups and sprayed finish chips so the approval is on the real material.
As-builts, care instructions, warranty letters and attic stock delivered with the final invoice.
The proof
5–7 days
Shop drawing turnaround
48 hrs
RFI response target
27
Repeat trade partners




FAQ
Something not covered here? Call 401-592-8148 and ask for Victor.
Related work

Start a project
Plans, sketches or a photo of the wall — all of it works. We reply within one business day.